We have Answers

The hotel project was completed in 2018 and was built using TS-04 model composite decking products. The decking of this model has a round hollow structure and has good load-bearing performance. Even if it is used in areas with large traffic in the hotel, there have been no quality problems such as breakage.

The decking adopts 3D wood grain technology, and the color is specially customized according to customer requirements. At present, the decking construction area has been used as the open-air activity area of the star hotel and has become a characteristic project of the hotel.